Aerial view of a powered greenfield data center site with a high-voltage substation

We have the buyers. Bring us the power.

Active offtake mandates

DSpace Development represents qualified compute and data center customers actively seeking powered capacity across North America and Europe. Every mandate below is live. If you control a site that fits, we can move to evidence review immediately.

Active mandates
9
Size range under mandate
2–200 MW
Under signed exclusive placement
2

What we are looking for

These are live mandates we hold from qualified offtakers and operators. We are the buy side on every one. Counterparty details are shared under NDA once a site passes evidence review.

150–200 MW+
Active
Texas preferred · US DC-friendly states
Type
Greenfield acquisition or lease
Timing
Initial power Q4 2027 / Q1 2028
Structure
Acquisition or lease
Pricing
Disclosed under NDA on qualified sites
Evidence
Credible written utility documentation required
Notes
Two nearby sites acceptable if contiguous capacity is not available
10–200 MW
Active
United States
Type
JV-ready powered land or development site
Timing
Delivery by 2027; separate 150–200 MW+ screen for Q4 2027 / Q1 2028
Structure
JV, acquisition or lease
Capital
Institutional capital aligned
Evidence
Written utility and permitting schedule required — no exceptions
25 MW
Signed exclusive placement
North America
Type
Immediate colocation placement
Timing
8–12 weeks to occupancy
Configuration
2–4 MW minimum contiguous per suite; can aggregate across sites
Technical
Tier III + SLA, liquid cooling, high-density GPU deployment
Term
3–5 or 5–7 years
Pricing
Disclosed under NDA on qualified sites
2 MW+ critical IT
Signed exclusive placement
North America · Europe
Type
Colocation placement, scalable
Configuration
Contiguous preferred
Technical
Direct liquid cooling, redundant fiber, high-density readiness
Notes
Customer operates its own environment
25 MW recurring
Active
North America · international
Type
Rolling colocation tranches — capacity for 1–2 sites per month
Configuration
2–4 MW contiguous per suite
Technical
Liquid cooling, high density, carrier-grade fiber required
20–60 MW
Active
ERCOT / Texas
Type
AI training cluster offtake
Technical
High-density compute, ERCOT interconnection
1–100 MW
Active
United States
Type
Existing data centers and powered infrastructure
Timing
Immediate to near-term power
Structure
Purchase, operate and build out
Notes
Powered land considered secondary; larger strategic assets also in scope
1–100 MW
Active
United States
Type
Dark, decommissioned or powered-shell facilities
Timing
Immediate to near-term power
Structure
Purchase or lease
Notes
Technical team can move quickly; asking price and negotiability required up front
Open size
Active
United States · Switzerland · international
Type
Powered land and lease screen
Structure
Purchase, lease or operating structure
Evidence
Written power evidence preferred

What we need from you

To move a site into review we need four things.

  1. 01

    Location

    Parcel, county and acreage, or building address and square footage.

  2. 02

    Power evidence

    Will-serve letter, capacity study, ISA, LGIA or queue position. A claimed number without documentation is not a starting point.

  3. 03

    Timing

    When power is energized or expected to energize, and what gates that date.

  4. 04

    Price and control

    Asking price or lease terms, and who controls the site today.

Submit a site

We have the buyers. Bring us the power.

If you control powered land, a powered shell or an existing facility that fits a mandate above, send it through. We review under NDA and respond with a clear yes or no.